Wyrefields, Poulton Business Park,
Poulton-le-Fylde, Lancashire, FY6 8JX
Contract Value £1,100,000.00
Contract duration 10 months
Role – Principal Contractor
Construction of a new build portal frame incorporating storage, offices and mezzanine levels.
Following a fire which destroyed the original units FJBS Ltd were engaged act Principal Contractor to carry out the demolition and rebuild of the building.
This project consisted of a steel portal frame, solid concrete floor, face brick and blockwork, metal cladding and aluminium fire-resistant windows.
The project was 750m2 split over 4 units each containing warehousing (with roller shutters) and offices separated by acoustic walling in blockwork, in areas adjacent to the warehousing and with stud partitions internally. Each unit contained a mezzanine level which was accessed by a bespoke steel staircase.
Wyrefields, Poulton Business Park,
Poulton-le-Fylde, Lancashire, FY6 8JX
Contract Value £1,100,000.00
Contract duration 10 months
Role – Principal Contractor